UTE Hydrogen Cadereyta

Development of engineering, procurement of equipment and materials, construction, testing, training, pre-starting and behavioral testing for the new Plant Generator of Hydrogen No.2, as well as the pipeline termination of 12 inches in diameter to transport high-pressure natural gas from the Branch Ramones Escobedo to the interior of the Ing. Hector R. Lara Sosa Refinery Cadereyta Jiménez NL 

This project included:

  • Civil Works
  • Electric Works
  • Industrial Safety and Environmental Protection
  • Quality
  • Site Control
  • Administration
  • Procura
Tags: EPC