ABKATUN GAS PIPELINES

Engineering, Procurement and Construction of 2 Pneumatic Pumping Pipelines: A Gas Pipeline of B.N. 12 ”x 12.1 kms. from ABKATUN-N1 P.T.V. To Batab-A. And a B.N. Gas Pipeline 8 ”x7.8 km. of the bottom valve lost in the Batab-A / Onel-A pipeline towards the bottom valve lost in the Manik-A / Ixtal-B pipeline.

YEAR: 2019

PLACE: CAMPECHE, GOLFO DE MÉXICO.

STRUCTURE TYPE:  PIPELINE