Naranjos Compression Station

Prefabricated, application of coatings and pipe assembly, fabrication of supports and assembly of equipment. Installation of valves and hydrostatic tests.TESTS: Hydrostatics and buried pipeASSEMBLY: Air cooler and paint to air cooler in pipe. Of catwalk, silhouette and pipe.TROQUE: Flanges and works in workshop.
admin See More

El Encino Compression Station

Mechanical work in pipes for high pressure natural gas. • Application of welding and installation of pipes of different diameters. • Paint application in pipe. • Structure assembly for the aircooler area of different diameters. • Assembly of auxiliary equipment of TCG -160 and TCG-161 turbines.
admin See More

Ramones Compression Station

Prefabricated, anticorrosive coating, installation and testing of pipes and carbon, alloy and stainless steel supports, area 110, 120, 130 & 320, Miguel Refinery, Hidalgo.
admin See More

Clean Gasoline Unit Tula

Prefabricated, anticorrosive coating, installation and testing of pipes and supports made of carbon, alloy and stainless steel, area 110, 120, 130 and 320, Miguel Hidalgo Refinery.
admin See More

Clean Gasolines Unit Salamanca

Prefabricated, anticorrosive coating, installation and testing of pipes and supports of alloy and stainless steel, area 110, 120, 130 & 200, Antonio M. Amor Refinery.
admin See More

Batteries Cárdenas Norte

Completion of engineering, procurement, construction and start-up of the separation, stabilization, dehydration and desalination processes of treatment and injection of congenital water for the Cárdenas Battery North.This project includes three sections:The first section a modern automated plant that will take care of the separation, stabilization, dehydration, desalination and measurement of crude oil.The second section is a water treatment…
admin See More

Tula Viscosity Reduction Plant

Rehabilitation of the viscosity reducing plant and peripheral areas that includes the dismantling, procurement, construction, testing and putting into operation in the Miguel Hidalgo Refinery.
admin See More

TAR Tapachula

CITAPIA by the hand of PEMEX Transformación Industrial carried out the work corresponding to the development of detailed engineering, procurement, construction, testing and commissioning of a new Storage and Distribution Terminal for the City of Tapachula.This project complies with the rule of being outside the urban area, but close to the railroad track and the…
admin See More

Steam Condensation Station EC 04

Development of basic and detail engineering, procurement, construction, integration, testing and commissioning of the Condensation Station of Vapor EC 04 when installed in the Ing. Antonio M. Amor Refinery.
admin See More

Aguas Amargas

Detailed engineering, procurement, construction, testing and startup of the 10,000 bpd bitter water treatment plant, as well as the procurement of equipment and materials and the construction of plant integrations at the facilities of the Francisco I. Madero Refinery.This project included:Civil and electrical worksIndustrial Safety and Environmental ProtectionQualityWorks ControlProcuraThe aim of the treatment of the…
admin See More

REVAMP Catalytic Plant FCC Cadereyta Refinery

Training, start-up preparations and behavior tests for the adequacy of the combustion gas system of the Catalytic Plant No.1 of Ing. Hector R. Lara Sosa Refinery.The Fuel Quality Project (PCC) and the production projects of ultra low sulfur fuels are some of the objectives of CITAPIA in support to the strategies assumed by PEMEX, to…
admin See More

Rehabilitation CCR Unit

Supply, prefabrication, on-site installation work for the modernization of the CCR unit in the Minatitlán Refinery; civil work, structures, electrical work, instrumentation, pipes, valves, equipment and insulation.
admin See More

Bocatoma

For CITAPIA, it is important to comply with the strategic objectives of Petróleos Mexicanos to achieve outstanding standards of efficiency and operational reliability, to contribute to compliance with the PGPB, for which it has established the integral project "Modernization and rehabilitation of the supply and treatment facilities of CPG water New PEMEX ".Among the works…
admin See More

Revamp and Industrial Maintenance Catalytic Plant No.1

Detailed engineering, procurement of equipment and construction materials, testing, training, start-up preparations and behavioral tests for the adaptation of the combustion gas system of the Catalytic Plant No. 1 of the Ing. Hector R. Lara Sosa refinery.Retiro, supply and installation of primary and secondary cyclones of the catalytic converter (regenerator).Dismantling of tertiary cyclone, with its…
admin See More

Separation Battery Coapechaca I – Chicontepec

Pre-fabricated in carbon steel pipe shop in different diameters and spool thicknesses: Gas system Vent system Air system Service water system Installation on site Installations Testing
admin See More

Chicontepec I and II – Poza Rica, Veracruz

Prefabricated and assembled pipe in different diameters and structure, hydrostatic testing, painting, rail mounting, workshop engineering and separation batteries. Enabled, fabricated and installed pipe and tank structure of crude storage. Manufacturing, installation, hydrostatic tests and radiographic inspections. Piping for gas, air and water systems. Piping for congenital, fire, gas water systems. Water systems, oil, dehydrated water, vent structure. Manufacture, installation and…
admin See More

Heat Recovery System (HRSG)

Técnicas Reunidas and CITAPIA have signed an agreement with the aim of designing and executing a commercial strategy that leads to the identification of business opportunities.Técnicas Reunidas is a company with extensive experience in engineering, execution and supply of industrial projects, being the largest company Spanish engineering and construction, in addition to one of the…
admin See More

Ovens Delayed Coking Unit

Manufacture of three ovens for the Delayed Coking unit in the Refinery, Miguel Hidalgo. The purpose of the project is the reuse of crude oil for the production of fuel.Manufacture of three ovens for the Delayed Coking unit in the Refinery, Miguel Hidalgo.Year: 2017 Place: Tula de Allende, Hidalgo Execution: 28 months
admin See More