Termination of the 12″ Diameter Gas Pipe to Transport High Pressure Natural Gas

Engineering development, procurement of equipments and materials, construction, testing, training, start up and testing for the ending of 12” diameter pipe gas to transport natural gas of high presure from ramones-escobedo ramal to Ing. Héctor Lara Sosa Refinery, in Cadereyta Jiménez, N.L.

Tags: epc