Minatitlán Refinery – Rehabilitation of Sulfur Plant U23000

Rehabilitation of static, dynamic equipment, instrumentation, electrical equipment, civil works, process lines, supply of materials and spare parts.

Placement of J / C, equipment disassembly (reel disassembly, flat cover, bonnet, back cover and floating cover).

-Extraction of tube bundle (with extractor), cleaning inside and outside.

-Arm (reel assembly, flat lid, bonnet, back cover and floating lid) and hydrostatic tests.

-Return and placement of thermal insulation.

-Installation of stump type support in 48 “pipe.

-Construction of armed stew with a weight of 20 tons. in its base for integration.

– Assembly of coils in the bottom of the sulfur pit.

-Place of J / C, disarmed of equipment (disassembly of reel, flat cover, bonnet, back cover and floating cover).

-Extraction of tube bundle (with extractor), cleaning inside and outside.

-Arm (reel assembly, flat cap, bonnet, back cover and lid floating) and hydrostatic testing.

-Rehabilitation of sulfur pit.

-Removal of solid sediments, inside the pit, replacement of the coils of the coil and hydrostatic tests.