TAR Tapachula

CITAPIA by the hand of PEMEX Transformación Industrial carried out the work corresponding to the development of detailed engineering, procurement, construction, testing and commissioning of a new Storage and Distribution Terminal for the City of Tapachula.This project complies with the rule of being outside the urban area, but close to the railroad track and the…
admin See More

Storage Tank 100,000 Barrels and 30,000 Barrels

Development of detailed engineering, procurement, construction, testing and commissioning of a storage tank with a capacity of 100,000 barrels, for heavy fuel oil in the storage and distribution terminal.
admin See More

Revamp and Industrial Maintenance Catalytic Plant No.1

Detailed engineering, procurement of equipment and construction materials, testing, training, start-up preparations and behavioral tests for the adaptation of the combustion gas system of the Catalytic Plant No. 1 of the Ing. Hector R. Lara Sosa refinery.Retiro, supply and installation of primary and secondary cyclones of the catalytic converter (regenerator).Dismantling of tertiary cyclone, with its…
admin See More

Revamping and Construction of the Mezcalapa River

For CITAPIA, it is important to comply with the strategic objectives of Petróleos Mexicanos to achieve outstanding standards of efficiency and operational reliability, to contribute to compliance with the PGPB, for which it has established the integral project "Modernization and rehabilitation of the supply and treatment facilities of CPG water New PEMEX ". Among the…
admin See More

Minatitlán Refinery – Rehabilitation of the Naftas U300 Hydrodesulfurization Plant

Work for the replacement of the packinox of the hydrodesulphurization plant of naphtha U300 of the Francisco I. Madero Refinery in the City of Madero, Tamaulipas.Opening and closing of entrance man.Information of internal (plates) and replacement of fittings.Interior cleaning with water under pressure.Test of fluency in background lines, legs and LG'S.Preparation, handling and assembly of…
admin See More

Minatitlán Refinery – Rehabilitation of Sulfur Plant U23000

Rehabilitation of static, dynamic equipment, instrumentation, electrical equipment, civil works, process lines, supply of materials and spare parts.Placement of J / C, equipment disassembly (reel disassembly, flat cover, bonnet, back cover and floating cover).Extraction of tube bundle (with extractor), cleaning inside and outside.Arm (reel assembly, flat lid, bonnet, back cover and floating lid) and hydrostatic…