Naranjos Compression Station

Prefabricated, application of coatings and pipe assembly, fabrication of supports and assembly of equipment. Installation of valves and hydrostatic tests.TESTS: Hydrostatics and buried pipeASSEMBLY: Air cooler and paint to air cooler in pipe. Of catwalk, silhouette and pipe.TROQUE: Flanges and works in workshop.
admin See More

El Encino Compression Station

Mechanical work in pipes for high pressure natural gas. • Application of welding and installation of pipes of different diameters. • Paint application in pipe. • Structure assembly for the aircooler area of different diameters. • Assembly of auxiliary equipment of TCG -160 and TCG-161 turbines.
admin See More

Ramones Compression Station

Prefabricated, anticorrosive coating, installation and testing of pipes and carbon, alloy and stainless steel supports, area 110, 120, 130 & 320, Miguel Refinery, Hidalgo.
admin See More

Clean Gasoline Unit Tula

Prefabricated, anticorrosive coating, installation and testing of pipes and supports made of carbon, alloy and stainless steel, area 110, 120, 130 and 320, Miguel Hidalgo Refinery.
admin See More

Clean Gasolines Unit Salamanca

Prefabricated, anticorrosive coating, installation and testing of pipes and supports of alloy and stainless steel, area 110, 120, 130 & 200, Antonio M. Amor Refinery.
admin See More

Batteries Cárdenas Norte

Completion of engineering, procurement, construction and start-up of the separation, stabilization, dehydration and desalination processes of treatment and injection of congenital water for the Cárdenas Battery North.This project includes three sections:The first section a modern automated plant that will take care of the separation, stabilization, dehydration, desalination and measurement of crude oil.The second section is a water treatment…
admin See More

Tula Viscosity Reduction Plant

Rehabilitation of the viscosity reducing plant and peripheral areas that includes the dismantling, procurement, construction, testing and putting into operation in the Miguel Hidalgo Refinery.
admin See More

TAR Tapachula

CITAPIA by the hand of PEMEX Transformación Industrial carried out the work corresponding to the development of detailed engineering, procurement, construction, testing and commissioning of a new Storage and Distribution Terminal for the City of Tapachula.This project complies with the rule of being outside the urban area, but close to the railroad track and the…
admin See More

UTE Hydrogen Cadereyta

Development of engineering, procurement of equipment and materials, construction, testing, training, pre-starting and behavioral testing for the new Plant Generator of Hydrogen No.2, as well as the pipeline termination of 12 inches in diameter to transport high-pressure natural gas from the Branch Ramones Escobedo to the interior of the Ing. Hector R. Lara Sosa Refinery Cadereyta…
admin See More

Steam Condensation Station EC 04

Development of basic and detail engineering, procurement, construction, integration, testing and commissioning of the Condensation Station of Vapor EC 04 when installed in the Ing. Antonio M. Amor Refinery.
admin See More

Aguas Amargas

Detailed engineering, procurement, construction, testing and startup of the 10,000 bpd bitter water treatment plant, as well as the procurement of equipment and materials and the construction of plant integrations at the facilities of the Francisco I. Madero Refinery.This project included:Civil and electrical worksIndustrial Safety and Environmental ProtectionQualityWorks ControlProcuraThe aim of the treatment of the…
admin See More

Storage Tank 100,000 Barrels and 30,000 Barrels

Development of detailed engineering, procurement, construction, testing and commissioning of a storage tank with a capacity of 100,000 barrels, for heavy fuel oil in the storage and distribution terminal.
admin See More

Rehabilitation CCR Unit

Supply, prefabrication, on-site installation work for the modernization of the CCR unit in the Minatitlán Refinery; civil work, structures, electrical work, instrumentation, pipes, valves, equipment and insulation.
admin See More

Bocatoma

For CITAPIA, it is important to comply with the strategic objectives of Petróleos Mexicanos to achieve outstanding standards of efficiency and operational reliability, to contribute to compliance with the PGPB, for which it has established the integral project "Modernization and rehabilitation of the supply and treatment facilities of CPG water New PEMEX ".Among the works…
admin See More

Revamp and Industrial Maintenance Catalytic Plant No.1

Detailed engineering, procurement of equipment and construction materials, testing, training, start-up preparations and behavioral tests for the adaptation of the combustion gas system of the Catalytic Plant No. 1 of the Ing. Hector R. Lara Sosa refinery.Retiro, supply and installation of primary and secondary cyclones of the catalytic converter (regenerator).Dismantling of tertiary cyclone, with its…
admin See More

Pajaritos

Activities of mechanical, painting and civil works in tank TV-224
admin See More

Separation Batteries and Chicontepec Storage and Pumping Central I and II

Prefabrication and different diameters and structure pipes assembly, hydrostatic testing, painting, handrails assembly, workshop engineering and separation batteries. Manufacturing and installation of pipelines and raw storage tanks’ structure. Manufacturing, installation, hydrostatic testing, and radiographic inspections. Pipeline for gas, air and water systems. Pipeline for congenital water, fire fighting and gas systems. Water, oil, dehydrated water, and venting structure system. Manufacturing, installation…
admin See More

Revamping and Construction of the Mezcalapa River

For CITAPIA, it is important to comply with the strategic objectives of Petróleos Mexicanos to achieve outstanding standards of efficiency and operational reliability, to contribute to compliance with the PGPB, for which it has established the integral project "Modernization and rehabilitation of the supply and treatment facilities of CPG water New PEMEX ". Among the…
admin See More

Valba

Valba Industrial WarehouseThe project has an area of 5,000m2, approximately. The project includes despalme, topography, movements and improvement of land and buried systems.
admin See More

Carso Group

Basement: Assembly and assemblyAssembly service of the metal superstructure.
admin See More